Guided Auger Boring

LIMITED SPACE

 

UNLIMITED POSSIBILITIES

The Guided Auger Boring machine is positioned between thrust walls in the launch pit and the line andgrade is set.

Pilot rods are pushed through the ground and kept on course via a steering head, which is monitored by atheodolite camera.
When the steering head reaches the reception pit the pilot rods are used to keep the auger flights on course.
Finally, clay jacking pipes are pushed through the bore.

Extent

Pipes from 80mm to 750mm diameter
Up to 70m in length
With an accuracy better than +/- 20mm.

導向螺旋鑽掘

Technical Extent & Specifications⭐

項目 (Specification)技術能力與規格 (Capacity & Performance)
適用管徑範圍 (Pipe Diameters)

80mm 至 750mm

最大施工長度 (Maximum Drive Length)

可達 70 米 (Up to 70 meters)

施工控制精度 (Installation Accuracy)

優於 ±20mm (Better than +/- 20mm)

導向與監控系統 (Guidance System)

光學經緯儀攝影機即時監控 (Theodolite Camera Monitoring)

適用管材種類 (Compatible Pipe Materials)

黏土頂管 (Clay Pipes)、鋼套管 (Steel Casing)、HDPE管等

Applications & Utility Projects✅️

  • Gravity Sewer and Stormwater Pipe Installation: High-precision slope control to ensure smooth drainage.
  • Water Supply Main Renewal: Trenchless installation of water pipelines beneath busy roadways.
  • Power and Telecom Conduit Installation (HDPE / Steel Pipe): Underground protective ducting for fiber optics and high-voltage cables.
  • Crossings Under Highways, Railways, and Building Foundations: Trenchless pipeline installation beneath existing surface structures without disrupting them.
  • Municipal Gas and Energy Pipeline Construction: Safe and reliable underground pipeline installation solutions.

Guided Auger Boring Process❗️

icon11

1.Pit Preparation

Construct the launching pit and receiving pit, install the thrust wall, and align the machine.

icon22

2.Pilot Rod Drilling

Use a theodolite camera to monitor the pilot head in real time and advance the pilot rod to the receiving pit at the predetermined angle.

icon33

3.Auger Reaming

After the pilot rod reaches the receiving pit, perform auger reaming to enlarge the borehole while simultaneously discharging the excavated soil back out.

icon44

4.Pipe Jacking

Progressively jack clay pipes or steel pipes into place, complete the pipeline installation, and carry out site restoration.

Guided Auger Boring FAQs❓️

常見問題faq2

How is the construction accuracy of Guided Auger Boring ensured?

We utilize a theodolite camera system in the launch pit to continuously monitor the steering head. This live tracking allows real-time optical adjustments, maintaining accuracy within +/-20mm.

Our equipment handles pipe diameters ranging from 80mm to 750mm, with a maximum single drive length of up to 70 meters.

Open-cut trenching requires extensive road closures and bulk excavation. Guided auger boring requires only two small shafts, significantly reducing traffic disruption, project timelines, and reinstatement costs.